25/28
TF6751_D
Aereco S.A.
5.3.
Installation check up
In order to ensure the proper fonctionning of the installation, do not forget to check the following key points :
Actions
Comments
Check that a 300mA is used for the main differential circuit
breaker
□
Measure the power supply (230V) in the derivation box for each
fan
□
Check that all RJ12 cables between modules are pluged
according to the installation and maintenance manual.
□
Check the wiring of the temperature sensor (accordingly to the
instructions)
□
Check the fixation from devices to plenum (3 Ø8mm
washers)
□
Check the grounding strap connection on the fan body insert
□
Check the distance (min 50cm) between the driver box and the
fan body
□
Check the vertical position of the driver box with the cable glands
facing downwards
□
Check that there are no foreign bodies inside the product body
that can make noise or prevent the turbine from rotating
□
Check one by one that all devices work properly (turbine rotation)
one it is plugged to 230V (see instructions)
□
Wait 15 minutes (checking time) to ensure there are no error
messages on the modules
□
Check that the numbered modules are connected to the
equivalent fans (Module 1 to fan 1, etc.)
□
Check the speed setting of the fan modules (according to the
instructions)
□
Check the group configuration (see module manual)
□