CHAPTER 6. MAINTENANCE
6.1
MAINTENANCE SCHEDULE
The Innovation Water Heater requires regular routine maintenance to ensure continued reliable operation
throughout the service life of the unit. For optimum operation, AERCO recommends that the following
routine maintenance procedures be performed in the time periods specified in Table 6-1.
Appendix I contains a list of the recommended spare parts for maintenance of the Innovation Heater.
WARNING
TO AVOID PERSONAL INJURY, PRIOR TO SERVICING ENSURE THAT THE
FOLLOWING GUIDELINES ARE STRICTLY OBSERVED:
•
DISCONNECT THE AC SUPPLY BY TURNING OFF THE SERVICE
SWITCH AND AC SUPPLY CIRCUIT BREAKER.
•
SHUT OFF THE GAS SUPPLY AT THE MANUAL SHUT-OFF VALVE
PROVIDED WITH THE UNIT
•
ALLOW THE UNIT TO COOL TO A SAFE WATER TEMPERATURE TO
PREVENT BURNING OR SCALDING
TABLE 6-1 - MAINTENANCE SCHEDULE
PARAGRAPH
ITEM
6 Mos.
12 Mos.
24 Mos.
Labor
Time
6.2
Igniter-Injector
(58023)
*Inspect
Inspect
Replace
15 mins.
6.3
Flame Detector
(66018)
*Inspect
Inspect
Replace
15 mins.
6.4
Combustion
Calibration
*Check
Check
1 hr.
6.5
Testing of Safety
Devices
Test
20 mins.
6.6
Fireside
Inspection
Inspect &
Clean
2 hrs.
6.7
Waterside
Inspection
Inspect
1 hr.
6.8
Heat Exchanger
Cleaning
Clean
2 hrs.
6.9
Condensate
Drain Trap
*Inspect
Inspect &
Clean
30 mins.
6.10
Air Filter
(59138)
Replace
5 mins.
*
Only performed after initial 6 month period after initial startup.