Benchmark 2500 - 3000 Boilers
CHAPTER 2 – INSTALLATION
OMM-0094_0F
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
17
of
207
GF-137
Ph.: 800-526-0288
09/30/2015
WARNING!
Keep the unit area clear and free from all combustible materials and
flammable vapors or liquids
.
CAUTION
While packaged in the shipping container, the unit must be moved by pallet
jack or forklift from the FRONT ONLY.
FOR MASSACHUSSETTS ONLY:
For Massachusetts installations, the unit must be installed by a plumber or
gas-fitter licensed within the Commonwealth of Massachusetts. In addition,
the installation must comply with all requirements specified in Chapter 1
Safety Precautions.
2.4.2 Setting the Unit
The unit must be installed on a concrete housekeeping pad, a
minimum of 4 inches (10.2 cm)
and a
maximum of 8 inches (20.3 cm)
thick, to ensure proper condensate drainage. If
anchoring the unit, refer to Figure 2-1b for anchor locations.
NOTES:
1) ALL HOLES ARE FLUSH WITH THE BOTTOM SURFACE OF THE FRAME
2) ALL DIMENSIONS SHOWN ARE IN INCHES [MILLIMETERS]
Figure 2-1b: Benchmark 2500/3000 Anchor Bolt Locations
A total of 3 lifting lugs are provided at the top of the primary heat exchanger as shown in Figure
2-2. Remove the front top panel from the unit to provide access to the lifting tabs.
Remove the four (4) lag screws securing the unit to the shipping skid. Lift the unit off the
shipping skid and position it on the
4 inch to 8 inch
(10.2 cm to 20.3 cm)
concrete
housekeeping pad (required) in the desired location.
FRONT
REAR