INITIAL START-UP
4-2
4.
Install an NPT-to-barbed fitting into the
tapped plug port.
5. Attach one end of the plastic tubing to the
barbed fitting and the other end to the 16
inch W.C. manometer.
Prepare the port for the combustion analyzer
probe as follows:
1. Remove the plug from the probe port on the
left or right side of the exhaust manifold.
2. If necessary, adjust the stop on the
combustion analyzer probe so that it will
extend mid-way into the flue gas flow. DO
NOT install the probe at this time.
4.3 NATURAL GAS COMBUSTION
CALIBRATION
Figure 4-1.
The Benchmark 3.0LN Boiler is combustion
calibrated at the factory prior to shipping.
However, recalibration as part of initial start-up is
necessary due to changes in the local altitude,
gas BTU content, gas supply piping and supply
regulators. Factory Test Data sheets are
shipped with each unit. These sheets must be
filled out and returned to AERCO for proper
Warranty Validation.
It is important to perform the following procedure
as outlined. This will keep readjustments to a
minimum and provide optimum performance
.
1. Open the water supply and return valves to
the unit and ensure that the system pumps
are running.
2. Open the natural gas supply valve(s) to the
1/8 Inch Gas Plug Location
4.2.3 Accessing the Vent Probe Port
The unit contains NPT plugs on both the left and
right side of the exhaust manifold at the rear of
the unit as shown in Figure 4-2.
UNIT
FRAME
unit.
3. Set the control panel
ON/OFF
switch to the
OFF
position.
4. Turn on external AC power to the unit. The
display will show
LOSS OF POWER
and the
time and date.
5. Set the unit to the Manual Mode by pressing
the
AUTO/MAN
key. A flashing
Manual
Valve Position
message will be displayed
showing the present air/fuel valve % open
FLUE
VENT PROBE
PORT
EXHAUST
MANIFOLD
CONDENSATE
TRAP
DRAIN
HOSE
position. Also, the
MANUAL
LED will light.
6. Adjust the air/fuel valve position to 0% by
pressing the ▼ arrow key.
7. Ensure that the leak detection ball valve
downstream of the SSOV is open.
8. Set the
ON/OFF
switch to the
ON
position.
9. Change the valve position to 29% using the
▲ arrow key. The unit should begin its start
sequence and fire.
TO FLOOR
DRAIN
Figure 4-2
Analyzer Probe Hole Location
Summary of Contents for Benchmark 3.0LN Series
Page 6: ...iv ...
Page 8: ...B ...
Page 42: ...INITIAL START UP 4 8 ...
Page 80: ...A 6 ...
Page 84: ...B 4 ...
Page 86: ...C 2 APPENDIX C ...
Page 93: ...APPENDIX F APPENDIX F F 1 ...
Page 94: ...APPENDIX F F 2 ...
Page 95: ...APPENDIX F F 3 ...
Page 96: ...APPENDIX F F 4 ...
Page 97: ...APPENDIX F F 5 ...
Page 98: ...APPENDIX F F 6 ...
Page 99: ...APPENDIX F F 7 66034 ...
Page 100: ...APPENDIX F F 8 ...
Page 101: ...APPENDIX F F 9 ...
Page 102: ...APPENDIX F F 10 ...
Page 103: ...APPENDIX F F 11 ...
Page 104: ...APPENDIX F F 12 ...
Page 105: ...APPENDIX F F 13 ...
Page 106: ...APPENDIX F F 14 ...
Page 107: ...APPENDIX G APPENDIX G G 1 ...
Page 108: ...APPENDIX G G 2 ...
Page 109: ...APPENDIX G G 3 ...
Page 110: ...APPENDIX G G 4 ...
Page 111: ...APPENDIX G G 5 ...
Page 112: ...APPENDIX G G 6 ...
Page 113: ...APPENDIX H APPENDIX H H 1 ...
Page 114: ...APPENDIX H H2 ...
Page 115: ...APPENDIX H H 3 ...
Page 116: ...APPENDIX H H 4 ...
Page 117: ...APPENDIX H H 5 ...
Page 118: ...APPENDIX H H 6 ...
Page 119: ...APPENDIX H H 7 ...
Page 120: ...APPENDIX H H 8 ...
Page 122: ...APPENDIX I I 2 ...
Page 126: ...NOTES ...