SKY-4120B User Manual
/ 用户手册
12
2.3.1.4
Mount the Chassis In the Rack
Insert the chassis slide rail into the rack as shown in the illustration below. Ensure
that the ball retainer is fully open before installing the chassis; otherwise catastrophic
damage to the chassis may occur. When returning the chassis to the rack, release
the slide from the locked position by pressing the slide trigger downwards.
Summary of Contents for SKY-4120B
Page 10: ...SKY 4120B User Manual x...
Page 13: ...Chapter 1 1 General Information...
Page 17: ...Chapter 2 2 System Setup...
Page 25: ...Chapter 3 3 Operation...
Page 34: ...SKY 4120B User Manual 22...
Page 35: ...23 SKY 4120B User Manual Chapter 3 Operation Figure 3 5 Redundant controller node replacement...
Page 36: ...SKY 4120B User Manual 24...
Page 37: ...Chapter 4 4 Cabling for Daisy Chain Storage...
Page 41: ...Chapter 5 5 Management Function Setup...
Page 46: ...SKY 4120B User Manual 34...
Page 47: ...Appendix A A Exploded Diagram and Parts List...
Page 49: ...37 SKY 4120B User Manual Appendix A Exploded Diagram and Parts List...