
AMT-70/AMT-73/AMT-75 Installation and Operation
DESCRIPTION
SPECIFICATION
18
RF Input (See A.2.7 for Input Power versus
Symbol Rate)
2 x F-type, (F) for 950MHz to 2150MHz
Impedance
: 75
Ω
Return Loss
:
≥
9 dB
Input Level:
10Log (Symbol Rate) -100 dBm, +12 dB
Maximum Composite Input Power:
-20dBm
Typical L-Band Phase Noise (at 2GHz)
-60 dBc/Hz at 10 Hz
-70 dBc/Hz at 100 Hz
-
80 dBc/Hz at 1 kHz
-
90 dBc/Hz at 10 kHz
-
98 dBc/Hz at 100 kHz
BER Performance and Channel Spacing
Refer to
for Viterbi and Viterbi with Reed Solomon FEC.
Refer to
LNB Supply Voltage
13V or 18V switchable
450 mA maximum
LNB Signals
22 kHz switching tone available
10 MHz reference output (nominal 0.5V p-p)
DATA & MANAGEMENT INTERFACES
Monitoring & Control (M&C)
Front Panel
: as standard
External M&C Interface
: 10/100Base-T, RS-232, RS-485, SNMP (future
option)
Configuration Parameter Storage
: NVRAM
Data Interfaces
RS 530 / V35 (standard)
ASI (optional)
Single HSSI interface (standard)
Triple HSSI interface (optional)
Ethernet 10/100 Base-T (optional)
G.703 (optional)
Nx T1/E1(optional)
Receiver ASI Interface
Encoded Line Rate:
270 MSymbol ± 100 ppm
Min Sensitivity (D21.5 idle pattern):
200 mV
Max Input Voltage:
880 mV p-p
Discrete Connector Return Loss:
≥
15 dB
Max. Distance:
150 m
PHYSICAL SPECIFICATIONS
Physical Dimensions
The AMT-70 is a rack-mountable 1RU EIA chassis.
Height
: 4.4 cm (1.75")
Width:
43.2 cm (17") without ears and 48.26cm (19”) with ears
Depth
:
40.6 cm (16")
Weight
: 11 lb (5 kg) maximum
Power AC (DC Optional)
AC: Auto sensing 95-265 VAC, 50/60 Hz
DC: 48 VDC (+32 to +72 VDC)
Typical Power Dissipation:
45 W without LNB/BUC power supply
60 W when powering LNB/BDC
150 W when powering BUC and LNB/BDC
Environmental
Operating Temperature
: 0
°
C to 45
°
C (32
°
F to 122
°
F)
Storage Temperature
: -25
o
C to 85
o
C (-13
o
F to 185
o
F)
Relative Humidity
: up to 90% non-condensing, operating; up to 95% non-
condensing, storage
Altitude
: Up to 10,000 ft (3,045 m) operating; to 40,000 ft
(12,180 m) during transit
Summary of Contents for AMT-70
Page 34: ...AMT 70 AMT 73 AMT 75 Installation and Operation 34 This page has been left intentionally blank...
Page 35: ...AMT 70 AMT 73 AMT 75 Installation and Operation 35 This page has been left intentionally blank...
Page 36: ...AMT 70 AMT 73 AMT 75 Installation and Operation 36 This page has been left intentionally blank...