Squeegee System 208
Service Manual – Advance 7765 / Nilfisk CR1500
Squeegee System Hydraulic Diagrams
Squeegee Up, Key Switch Off
When the squeegee is up and the machine is shut off, the
Squeegee Lock Up (10)
solenoid valve is de-
energized to block the oil flow from the lower port on the
Squeegee Deck Cylinder
. This holds the squeegee up
in the retracted position when the machine is shut off.
C3
C4
C2
C1
1.02
CIR
Check Valve
270 PSI
Reservoir
Auxiliary
Pump
8.2 GPM
1.5 GPM
Cylinder
Control
Valve
P
T
To Squeegee
Vacuum Motor
Scrub Brush
Solenoid (6)
Scrub Brush
Solenoid (8)
Squeegee
Cylinder
Solenoid (7)
Squeegee
Lock Up (10)
Scrub Brush
Lock Up
Solenoid (9)
Squeegee
Deck
Cylinder
To and From
Scrub Deck
Cylinder
Squeegee
Locked Up
Power
Steering
Unit
1500
PSI
3.1
CIR
P
T
Power Steering
Cylinder
L
R
Summary of Contents for 56514925
Page 28: ...General Information 28 Service Manual Advance 7765 Nilfisk CR1500 Maintenance Item Locations ...
Page 74: ...Engine System common Electrical System 74 Service Manual Advance 7765 Nilfisk CR1500 ...
Page 89: ...Engine System Diesel 89 Service Manual Advance 7765 Nilfisk CR1500 Starter Relay ...
Page 113: ...Engine System Gasoline LPG 113 Service Manual Advance 7765 Nilfisk CR1500 ...
Page 114: ...Engine System Gasoline LPG 114 Service Manual Advance 7765 Nilfisk CR1500 ...
Page 115: ...Engine System Gasoline LPG 115 Service Manual Advance 7765 Nilfisk CR1500 ...