
Installation
Page
46
of
72
GSS0608
Version: 1.3
Basic procedure for inserting battery modules:
F
IGURE
19:
P
OSITIONING THE BATTERY MODULE
•
Place the battery module on the
support rails of the lifting
equipment and position at the
intended installation height. Note
the order of installation when
doing so.
•
Push the module halfway into the
rack.
F
IGURE
20:
I
NSERTING THE BATTERY MODULE INTO THE
RACK
•
Slide the battery module into the
rack until it is flush.
F
IGURE
21:
S
CREWING ON THE BATTERY MODULE
•
Using 2 Nm of torque, fix the
modules on the front side with
the socket head cap screws
provided.
(M6x16 DIN 912, 4 for each
module).
•
Repeat steps 1 to 3 for the
remaining modules.
1
2
3
Summary of Contents for StoraXe PowerBooster GSS0608
Page 1: ...StoraXe PowerBooster Compact storage system GSS0608 ...
Page 4: ......
Page 14: ...Preliminary information Page 10 of 14 GSS0608 Version 1 3 6 Bottom view of unit ...
Page 15: ...Preliminary information Page 11 of 14 GSS0608 Version 1 3 7 Checklist for commissioning ...
Page 16: ...Preliminary information Page 12 of 14 GSS0608 Version 1 3 ...
Page 21: ......
Page 22: ......
Page 118: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 138: ......
Page 139: ......