7.4.2 Earth connection
NOTE
Observe the earth connection.
The housing system must be properly earthed at the designated location with
an earthing cable and maintained in accordance with VDE0113 (
Electrical
diagram in manual GSS0608
).
The device includes interference suppressor filters with increased earth leakage
currents. Ensure that the PE conductor has at least half the cross section of a
phase conductor.
The earth connection is made via a foundation earth electrode, which must be installed according to local
conditions.
Foundation earth electrodes must meet the DIN 18014:2014-03 standard.
F
IGURE
11:
F
OUNDATION EARTH ELECTRODE
IMPLEMENTATION
Follow the electrical diagram for all
electrical connections.
Cable glands
•
Feed the foundation earth
electrode from the outside
through the cable gland.
•
Make sure that the cable inlet is
sealed from the outside.
1
1
Summary of Contents for StoraXe PowerBooster GSS0608
Page 1: ...StoraXe PowerBooster Compact storage system GSS0608 ...
Page 4: ......
Page 14: ...Preliminary information Page 10 of 14 GSS0608 Version 1 3 6 Bottom view of unit ...
Page 15: ...Preliminary information Page 11 of 14 GSS0608 Version 1 3 7 Checklist for commissioning ...
Page 16: ...Preliminary information Page 12 of 14 GSS0608 Version 1 3 ...
Page 21: ......
Page 22: ......
Page 118: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 138: ......
Page 139: ......