![Adisa ADI LT 105 Technical Manual Installation Maintenance Download Page 45](http://html.mh-extra.com/html/adisa/adi-lt-105/adi-lt-105_technical-manual-installation-maintenance_2851532045.webp)
ADI LT boiler – Technical manual
Page
45
16.2 THE BOILER CONTROL UNIT AND OPERATING CYCLE
The control unit regulates:
•
The boiler operating cycle.
•
The boiler safeties (by indicating also the possible reasons for the boiler lockout).
•
The boiler power modulation.
Short description of the boiler operating cycle:
LEGEND of the operating phases:
Display
Meaning
00
Boiler in stand-by (the installation is not receiving any request of heat)
01
The boiler stops due to lack of gas pressure (minimum gas pressure switch)
02
Motor fan is activated (revolutions increase)
03
Start of the pre-venting phase
04
Time out (control of the fan speed)
05
Time of pre-ignition
06
Safety time of ignition and ionization control (constant)
07
Safety time of ignition and ionization control (variable)
10
Operation in the heating mode
11
Not available phase: D.H.W.S. operation
(according to the installation and to the boiler configuration)
12
Not available phase: Heating and D.H.W.S. operating in parallel
(according to the installation and to the boiler configuration)
20 / 21
Post air-venting and fan stop
22
Self-test and return to the initial position
99
Alarm / lockout (alarm code visualized on the display)