
ADI LT boiler – Technical manual
Page
35
Example 1: installation with 1 boiler
5
1
4
2
3
6
7
Legend:
1. Boiler
2. Horizontal section connected to the boiler flues outlet (it should be as shortest as possible and with the
minimum number of elbows)
3. “T” chimney
4. Draining: outlet of the condensed products and of rain water
5. Flue draught stabilizer
6. Vertical section of the chimney
7. Chimney outlet
8. Connection between boilers and flues collector
9. “T” to connect the flues collector to each boiler
10. Flues collector (we recommend that it has an upward slope up to the vertical section of the chimney, min.
3%)
15.6.3. Old installation
-
In case of using a metallic and insulated chimney already existing, before installing the boiler it is advisable
to verify that the chimney has the right dimensions to allow a correct evacuation of the burnt gases and to
clean its interior.
-
In case of using a brick chimney already existing, it is necessary to fit it with an internal metal casing in
order to avoid water condensing in all its length. If it is not possible to do it, it is advisable to install a new
insulated chimney, preferably made of stainless steel and in accordance with the current regulations.
1
7
5
5
4
2
3
1
4
2
3
6
10
9
8
8
9
Example 2: installation with two boilers and
one common chimney (see regulations)