
ADI CD boiler - Technical Manual
11
6.2 Models ADI CD 450 to ADI CD 950
CONCEPT
Units
450 550 650 750 850 950
Power output
Maximum power
(average water
temp: 70ºC)
kW
440 530 598 675 792.7
892.3
Power output
Maximum power
(average water
temp: 40ºC)
kW
443.5 535.5 605 682.4 802.1 904.1
Power output
Minimum power
(average water
temp: 40ºC) (*)
kW
141
230.9
(173.8)
259.4
(195.2)
292.4
(220.1)
338.2 380.9
Power input
Maximum kW
448 546 618 700 818.5
924.5
Minimum (*)
kW
134
218.6
(163.9)
247.2
(185.4)
280
(210)
327.4 369.8
Natural Gas
Gas flow Max.
m
3
/h
41.7 50.8 57.5 65.1 76.1 85.9
(G20) Flues
flow
m
3
/h
1018 1170 1321 1491 1775 2007
Flues Residual
Pressure
Pa
90 72 75 78 177.5
266.2
Boiler weight without water
kg
460 480 485 485 545 545
Water capacity
litres
118 120 120 120 164 164
Max. water pressure
bar
5 5 5 5 5 5
Water
Δ
T = 10ºC
m
3
/h
37.8 45.6 51.4 58.1 68.2 76.7
flow
Δ
T = 12ºC
m
3
/h
31.5 38 42.9 48.4 56.8 64
rate
Δ
T = 15ºC
m
3
/h
25.2 30.4 34.3 38.7 45.5 51.2
Electric
Consumption
At max. output
W
767.8 627.4 830 1139 1300 1800
At min. output
W
124.4 83 82.8
108.4
300 320
Maximum
consumption
W
767.8 627.4 830 1139 1300 1800
Supply
V
1x230 V
1x230 V
1x230 V
1x230 V
3x380 V
3x380 V
Natural gas L.C.V. = 10.757 kW/m
3
(38.728 MJ/m
3
)
Propane gas = CONSULT chapter 18.4.2
Electric supply to the boiler:
ADI CD 450 – 750: 230 V, 50 Hz, single-phase and ground.
ADI CD 850 – 950: 380 V, 50 Hz, three-phase and ground.
ADI CD electric current
Maximum power
Minimum power (40%)
ADI CD 850
2.43
amp
0.34
amp
ADI CD 950
2.74
amp
0.35
amp
The electric protection of each boiler must be prepared considering the maximum value between the
electric consumption at the start-up and the electric consumption at the maximum power output.
ADI CD 450 to 750: modulating power from 30%.
(*) Minimum power output adjustable up to 30% of the gas power: to be adjusted onsite (during
commissioning), depending on installation factors
second values of the above chart list.
ADI CD 850 and ADI CD 950: modulating power from 40%.
Note: data in the present document are liable to changes without prior warning.
Summary of Contents for ADI CD 375
Page 1: ...1 º º ADI CD CONDENSING BOILER TECHNICAL MANUAL OF INSTALLATION USE AND MAINTENANCE V 07 2017 ...
Page 7: ...ADI CD boiler Technical Manual 7 Models ADI CD 200 and higher A C D B J H G F E R S ...
Page 34: ...ADI CD boiler Technical Manual 34 12 1 Electric drawing ADI CD 70 750 ...
Page 35: ...ADI CD boiler Technical Manual 35 12 2 Electric drawing ADI CD 850 950 ...