Installation and Commissioning Guide- Package Ducted Variable Capacity Commercial
Doc. Part No. 0525-076 Ver. 3 210414
09. Package Unit Preparation
NOTE
It is important to remove the shipping blocks before unit operation.
Step 1. Remove Access Panel, as shown below:
PACKAGE UNIT
Access Panel
Use allen keys to remove the
Access Panel (Hex Recess 8mm)
Remove access panel-electrical.
B
Removal Order:
Pull-Out 20mm
Pull-Down to remove
Access Panel-Electrical
A
B
A
Do not disconnect Earth Cable.
Earth
Cable
Remove
Access Panel