Installation and Commissioning Guide - Split Ducted Indoor Unit
Doc. No.0525-074
Ver. 3 200811
Installation and Commissioning Guide
Split Ducted Indoor Units
2
Table of Contents
01. Introduction ...................................................................................................................................3
01.01. Information About This Guide
3
01.02. Product Inspections
3
01.03. Codes, Regulations And Standards
3
01.04. Important Safety Symbols And Labels
3
02. Safety Instructions .........................................................................................................................4
03. Components Overview ...................................................................................................................5
03.01. Indoor Unit Components Overview
5
03.02. Indoor Unit Electrical Panel Overview
5
04. Unit Dimensions and Clearances ....................................................................................................6
04.01. EVA100S
6
04.02. EVA130S
7
04.03. EVA150S
8
04.04. EVA170S
9
04.05. EVA200S
10
04.06. EVA230S
11
05. Two-Piece Fan Coil .......................................................................................................................12
05.01. Coil Section
12
05.02. Fan Section
16
06. Installation Instructions ...............................................................................................................19
07. Unit Lifting Procedures .................................................................................................................21
07.01. Crane Lifting Method
21
07.02. Fork Lift Method
22
08. Safety Drain Tray .........................................................................................................................23
09. Zone Barrel Installation Instructions .............................................................................................24
10. Electrical Installation ....................................................................................................................25
11. Wiring Diagram ............................................................................................................................26
12. Split Unit Electrical Connection ....................................................................................................27
13. Maximum Cable Lengths .............................................................................................................29
13.01. Wall Controller Options
29
13.02. Wiring Configuration : Recommended
30
13.03. Alternate Wiring Configuration
31
14. Cable Length - Zoning ..................................................................................................................32
15. Wiring Connections .....................................................................................................................33
15.01. LR7-1 and LC7-2 Wall Control Wiring Connections
33
15.02. NEO Wall Control Wiring Connections
33
15.03. LM-RS-2 Optional Sensor Wiring Connections
34
15.04. AERSS Optional Duct Sensor Wiring Connections
34
16. Zone Commissioning ....................................................................................................................35
17. Maintenance Frequency Checklist ................................................................................................36
18. Key Parts List ................................................................................................................................37