
51
Operating log
Measures during installation
Excess height
- required:
mm
- available:
mm
Tightness test
(if demanded for) carried out:
(also refer to installation manual)
Date:
Installation
contractor:
Signature:
Please observe installation manual
Measures for commissioning
1) Fill all basins of separator plant with fresh water:
Carried out by:
Signature:
2) Insert float for automatic seal:
Carried out by:
Signature:
Date:
Date: