
38
Maintenance
8.2 Maintenance works by the expert
user
This subchapter holds information on works to be carried out by the user.
8.2.1 Monthly checks
The following checks must be carried out once a month:
■
Determination of the sludge trap volume.
Recommendation
Use a plate fixed to rod end
■
A control kit to check light liquid separator plants is available from
us.
➔
Open maintenance opening
➔
Place rod vertically in separator besides coalescence insert until sediment upper
edge is reached
➔
Disposal when 50 % of the sludge trap volume is reached
Table 12:
Measurements determination of sludge trap volume
NS
Measurement plate up to lower edge of separator
housing cover
3
1020 mm
6
1290 mm
10
1200 mm