59
7. PWR BD board must check the height of soldering tin
This step needs check connector and boss height.
A piece of screw*1pcs needs dress.
8. The assembly of OPE and LC
This step needs screw/8F.VA564.7R0*3pcs to tighten.
And the sequence needs obey according to picture.
For EMI, the rubber power is necessary.
This cord direction should like this
Screw*1pc
Summary of Contents for X1130P Series
Page 16: ...16 System Block Diagram ...
Page 17: ...17 Product Overview ...
Page 18: ...18 ...
Page 19: ...19 ...
Page 20: ...20 ...
Page 45: ...45 Fig 3 3 Fig 3 4 Fig 3 5 Fig 3 6 Datum1 Datum2 Datum3 Clip UP CM Sponge ...
Page 58: ...58 ...
Page 61: ...61 Confirm the position of EMI cord right Screw Screw ...
Page 64: ...64 12 Front IR wire to MB alignment Front IR wire should align in to these grooves ...
Page 74: ...74 Power Supply Problems Checking Flow ...
Page 84: ...84 Chapter 5 FRU List Exploded Diagram Module 1 Total Exploded View ...
Page 85: ...85 ...
Page 86: ...86 Module 2 ASSY UPPER CASE ...
Page 87: ...87 Module 3 ASSY LOWER CASE ...
Page 88: ...88 Module 4 ASSY FRONT CASE ...
Page 95: ...95 X1130PA X1230PK X1230P X1230PA X1237 Customer code 0813 ...