81
2. Overfill adjustment (Blue Edge adjustment)
1. “Full White Pattern” is suggested for this alignment.
2. Adjust 2 LP-alignment Screws (upper side / lower front side of Optical Engine) behind
Color Wheel.
3. Alignment Criteria is to adjust these 2 screws until “No Dark Edges” and “ No
Shadows” can be observed in image.
Summary of Contents for X1130P Series
Page 16: ...16 System Block Diagram ...
Page 17: ...17 Product Overview ...
Page 18: ...18 ...
Page 19: ...19 ...
Page 20: ...20 ...
Page 45: ...45 Fig 3 3 Fig 3 4 Fig 3 5 Fig 3 6 Datum1 Datum2 Datum3 Clip UP CM Sponge ...
Page 58: ...58 ...
Page 61: ...61 Confirm the position of EMI cord right Screw Screw ...
Page 64: ...64 12 Front IR wire to MB alignment Front IR wire should align in to these grooves ...
Page 74: ...74 Power Supply Problems Checking Flow ...
Page 84: ...84 Chapter 5 FRU List Exploded Diagram Module 1 Total Exploded View ...
Page 85: ...85 ...
Page 86: ...86 Module 2 ASSY UPPER CASE ...
Page 87: ...87 Module 3 ASSY LOWER CASE ...
Page 88: ...88 Module 4 ASSY FRONT CASE ...
Page 95: ...95 X1130PA X1230PK X1230P X1230PA X1237 Customer code 0813 ...