171
fully engaged in the mounting channels. Ensure that the Component
Release Levers are in locked position.
4.Press and hold the left and right Slide Extension Release Levers
and slowly slide the component and Slide Rails into the fully
retracted position.
Cable Management ARM installation
Note: Read the General Safety Information below before
attempting installation. The Cable Management Arm (CMA)
pivots at its rear mounting position, and slides along its front
Summary of Contents for Altos R710
Page 1: ...Acer Altos R710 User s Guide ...
Page 12: ......
Page 13: ...1 System information ...
Page 21: ...2 System tour ...
Page 37: ...3 Getting Started ...
Page 38: ...This chapter gives information on setting up and starting to use your system ...
Page 42: ...3 Getting Started 30 ...
Page 43: ...4 Configuring the system ...
Page 94: ...4 Configuring the system 82 ...
Page 95: ...5 BIOS setup ...
Page 155: ...6 Troubleshooting ...
Page 170: ...6 Troubleshooting 158 ...
Page 171: ...Appendix A Management software installation ...
Page 172: ...This appendix shows you how to install the ASM software packages ...
Page 176: ...Appendix A Management software installation 164 ...
Page 177: ...Appendix B Tool less rail kit installation ...
Page 189: ...Appendix C RAID Configuration ...
Page 190: ...This appendix shows you how to create RAID ...
Page 195: ...Appendix D BIOS POST Checkpoint Codes ...
Page 211: ...199 F7h Boot to Full DOS Checkpoint Code Beep Code Description ...
Page 212: ...Appendix D BIOS POST Checkpoint Codes 200 ...
Page 214: ...202 U Upgrading the CPU 45 62 80 Upgrading the system 33 ...