37
Opening the server
Caution!
Before you proceed, make sure that you have turned
off your system and all peripherals connected to it. Read the
“Preinstallation instructions” on page 35.
You need to open the server before you can install additional
components. The bezel and left side panel are removable to allow
access to the system’s internal components. Refer to the following
sections for instructions.
Removing the left-side panel
1
Observe the ESD precautions and pre-installation procedures
described on page 35.
2
Remove the bezel door and the bezel.
Refer to the preceding sections for detailed instructions.
3
Remove the left-side panel.
(1) Remove the two screws located at the end of the side
panel
(1)
.
(2) Press the release button located on the left-side panel
(2)
.
(3) Slide the side panel toward the rear of the chassis
(3)
.
Summary of Contents for Altos G5350
Page 1: ...Acer Altos G5350 Series User s Guide ...
Page 10: ...x ...
Page 11: ...1 System tour ...
Page 31: ...21 5 4 pin power cable connector 6 I2 C bus interface connector No Code Description ...
Page 32: ...1 System tour 22 ...
Page 33: ...2 System setup ...
Page 43: ...3 System upgrade ...
Page 88: ...3 System upgrade 78 ...
Page 89: ...4 BIOS setup ...
Page 123: ...113 Save Changes Saves changes made in the BIOS setup Parameter Description ...
Page 124: ...4 BIOS setup 114 ...
Page 125: ...5 Troubleshooting ...
Page 136: ...5 Troubleshooting 126 ...
Page 137: ...Appendix A System management utility ...
Page 144: ...Appendix A System management utility 134 ...
Page 145: ...Appendix B Acer Altos G5350 rack installation guide ...
Page 146: ...This appendix shows you how to set up the Altos G5350 server in a rack mount configuration ...
Page 161: ...Appendix C SCSI RAID configuration ...
Page 162: ...This appendix shows you how to create a RAID volume in your SCSI drives ...