143
2
Remove the inner rails from the mounting rails.
Note:
The rack mount kit contains a bag of screws, two sets of
side handles, rack brackets and mounting rails. The side handles
are attached to the sides of the server. The rack brackets attach
the mounting rails to the server. The mounting rails allow the
server to slide in and out of the rackmount for maintenance
purposes. Each mounting rail consists of: inner rail, middle slide,
and fixed outer rail. The fixed outer piece is screwed onto the rack
bracket with a M4 x L8 metal screw and nut, an inner rail is
attached to the sides of the server with the #8-32 screws and an
middle sliding piece controlled by a steel ball gearing movement.
(1) Extend the inner rail from the mounting rail until the rail
release latch clicks.
(2) Depress the release latch
(1)
and slip the inner rail out
(2)
.
(3) Do the same thing to the other mounting rail.
Summary of Contents for Altos G5350
Page 1: ...Acer Altos G5350 Series User s Guide ...
Page 10: ...x ...
Page 11: ...1 System tour ...
Page 31: ...21 5 4 pin power cable connector 6 I2 C bus interface connector No Code Description ...
Page 32: ...1 System tour 22 ...
Page 33: ...2 System setup ...
Page 43: ...3 System upgrade ...
Page 88: ...3 System upgrade 78 ...
Page 89: ...4 BIOS setup ...
Page 123: ...113 Save Changes Saves changes made in the BIOS setup Parameter Description ...
Page 124: ...4 BIOS setup 114 ...
Page 125: ...5 Troubleshooting ...
Page 136: ...5 Troubleshooting 126 ...
Page 137: ...Appendix A System management utility ...
Page 144: ...Appendix A System management utility 134 ...
Page 145: ...Appendix B Acer Altos G5350 rack installation guide ...
Page 146: ...This appendix shows you how to set up the Altos G5350 server in a rack mount configuration ...
Page 161: ...Appendix C SCSI RAID configuration ...
Page 162: ...This appendix shows you how to create a RAID volume in your SCSI drives ...