2
Installation Guide
2
Pre-installation Requirements
2.1
Selecting a Site
Before unpacking and installing the system, select a suitable site for the
system for maximum efficiency. The system is suitable to set up in an office
environment.
Consider the following factors when choosing a site for the system:
•
Near a grounded power outlet
•
Clean and dust-free
•
Sturdy surface free from vibration
•
Well-ventilated and away from sources of heat
•
Secluded from electromagnetic fields produced by electrical devices
such as air conditioners, radio and TV transmitters, etc.
Summary of Contents for Altos 11000 System
Page 1: ...AcerAltos 11000 System User s Guide ...
Page 31: ...System Board 1 15 Figure 1 5 Installing an ISA Card ...
Page 59: ...BIOS Utility 3 3 3 2 ...
Page 110: ...H90 Housing User s Guide ...
Page 131: ...System Housing 13 Right Panel Left Panel ...
Page 135: ...System Housing 17 3 Secure the drive with four screws 4 Insert the drive into the bay ...