
AcerAltos 19000 User’s Guide
3-10
3.5
Power Subsystem
This section gives a brief description of the power subsystem. Refer to Appendix
C for a detailed discussion.
The power subsystem consists of a power backplane, swappable power supply
modules, and an optional uninterruptible power supply (UPS) module held in
place by a metal rack enclosure. The backplane and the rack allow installation of
up to three 400-watt power supply modules in a load-sharing (across two),
redundant configuration.
3.6
ESD Precautions
Always observe the following ESD (electrostatic discharge) precautions before
installing any system component:
1. Do not remove any system component from its packaging unless you are
ready to install it.
2. Wear a wrist grounding strap before handling electronic components. Wrist
grounding straps are available at most electronic component stores.
DO NOT attempt the procedures in the
following sections unless you are confident of
your capability to perform them. Otherwise,
ask a service technician for assistance.
Summary of Contents for AcerAltos 19000
Page 1: ...AcerAltos 19000 User s Guide ...
Page 30: ...AcerAltos 19000 User s Guide 1 14 ...
Page 36: ...AcerAltos 19000 User s Guide 2 6 2 2 2 Mouse Figure 2 4 Connecting a Mouse ...
Page 37: ...Chapter 2 Setting Up the System 2 7 2 2 3 VGA Monitor Figure 2 5 Connecting a VGA Monitor ...
Page 49: ...Chapter 3 System Housing 3 7 Figure 3 7 Removing the Lower Front Panel Door ...
Page 74: ...AcerAltos 19000 User s Guide 4 18 ...
Page 162: ...AcerAltos 19000 User s Guide 7 32 ...
Page 172: ...AcerAltos 19000 User s Guide A 10 ...
Page 186: ...AcerAltos 19000 User s Guide B 14 ...
Page 209: ...Index 5 W When to Use the SCSISelect Utility 7 3 ...