Before Installtion
The installation must be perfomred by qualified, competent accredited professionals
who have received formal training and have experience with high voltage and current
devices. Appropriate safety wear (gloves, glasses, arc flush suit, etc.) is mandatory to
ensure safe installation.
During normal meter operation, caution should be used when handling the following
as high voltage may be present: Terminal Blocks, Current Transformer connection
nodes, Potential Transformer connection nodes and the related circuits. All primary
and secondary circuits may contacting lethal current and voltage. Contact with current
channels must be avoided.
The power meter and I/O modules cannot be installed on the primary side of
transformers or where VA has limitations. The power meter can be only installed on the
secondary side. Avoid contacting with meter terminals after the completion of installtion.
Do not input voltage above the rated maximum limit of the power meter and devices
connected to it. Before energizing the meter, please refer to the meter's label and
specifications.
Do not perform high voltage test / insulation experiment to output, input or
communication terminals.
The use of shorting blocks and fuses are recommended. Current transformers need to
be grounded.
Use dry cloth to wipe the meter.
The replacement of the battery must be performed by professionals.
Summary of Contents for AcuRev 1200 Series
Page 1: ...User s Manual AcuRev 1200 Energy Meter...
Page 2: ......
Page 8: ...VI AcuRev 1200...
Page 32: ...24 AcuRev 1200 Choose Choose...
Page 35: ...27 AcuRev 1200 Figure 4 1 Basic setting parameters in the software...
Page 52: ...44 AcuRev 1200...
Page 86: ...78 AcuRev 1200...
Page 93: ......