Machine Settings
Open Blow:
Slide gate fully open.
Air Speed: 8 - 10
Hose: 3"x 50' blowing hose all the way to the attic.
Wall Spray (all fibers):
Set slide gate open to 7"(10th hole).
Air Speed: 6
Hose: 3''x 50' to 3'x50' to 2.5"x50' to spray nozzle.
Dense Packing:
Set slide gate open to 3" (4th hole).
Air Speed: 6 (3.0 psi minimum)
Hose: 3"x 50' to 2.5"x50' to 2"x50' to reducer to wall tube.
Note: All the above are suggested settings and may vary depending on operating
conditions. For attics and dense packing, reduce feed slide gate opening if
clogging occurs. Increase opening to maximize production if material is moving
freely. For wall spray, reduce gate opening if material is too dry; increase gate
opening if too wet.
11