Troubleshooting •
11
169
08424705001 (01) 2017-04 USA • Accu-Chek Inform II Operator’s Manual Version 6
■
Once you have confirmed the message
Loss of
Date/Time
, the screens for entering the date and
the time appear.
4
Enter the date and time. After you have entered the
correct information, confirm each screen with
.
■
Unless your QC configuration is
Always OK
(see
page 137), the meter will now be in QC Lockout due
to the manually entered date/time.
5
Synchronize the meter’s date/time with the date/
time of your facility via base unit or, if working wire-
lessly, wait at least ten minutes for the next WLAN
synchronization before performing any further
tests.
Even if your configuration does not require it, we
recommend always performing a QC test after a meter
reset.
1
2
3
4
5
6
7
8
9
0
Date
03/17/17
12:00 am
03/17/17
1
2
3
4
5
6
7
8
9
AM/PM
0
Time
12:00 am
12:48 pm
03/17/17
Summary of Contents for Inform II
Page 3: ...08424705001 01 2017 04 USA Operator s Manual Version 6 0 A ACCU CCU CHEK HEK Inform II System ...
Page 245: ...245 Notes ...
Page 246: ...246 Notes ...
Page 247: ...247 ...