KL II
Series User Manual 20
Step Five:
Complete the installation of all cabinet combination
units, and install cables according to the power supply
and signal routing design plan, and install the LED
module after power-on inspection and confirmation.
4.3 Rigging installation
This product can be hoisted by hanging beams
Lifting installation steps:
1.First, use airplane belts or wire ropes to fix the hanging beams on the truss or steel structure,
and use connecting blocks to connect the left and right hanging beams, and keep them on the
same horizontal line.
(Note: When installing the hanging beam, the arrow direction on the top of the hanging beam is
the same as the front of the LED display)
2.Align the positioning pin of the cabinet with the positioning hole of the hanging beam, and use
M6 bolts to lock the cabinet and the hanging beam.
(Note: Two M6 bolts are installed between the hanging beam and the cabinet, one is installed
from the left side of the front, and the other is installed from the left side of the back)
3.According to the above operation method, install the adjacent cabinets of the first layer in turn,
and use M6x30mm bolts to lock.