background image

Absco Industries

Assembly Instruction Manual

ABSCO SIGNATURE GAZEBO

MODEL: ADGAZEBO33

3.11m W x 3.11m D x 2.60m H

Model: ADGAZEBO33

21/09/23

1.00

14  

 

 

Information in this manual has been designed in 
accordance with the following Australian and New 
Zealand Standards.

– National Construction Code of Australia 2022

– Specification S4C2—Design of Building in 
Cyclonic Areas NCC2022 VOL 1

– Part H1D7 Sheet Roofing of NCC 2022 Vol 2

– AS 1163:1991 Structural Steel Hollow Sections

– AS/NZS 1170.0:2002 Structural Design Actions 
Part 0— General Principles

– AS/NZS 1170.1:2002 Structural Design Actions 
Part 1— Permanent, Imposed & Other Actions

– AS/NZS 1170.2:2021 Structural Design Actions 
Part 2— Wind Actions

– AS/NZS 1170.3:2003 Design Actions Part 3— 
Snow and Ice Actions

– AS/NZS 1554.1:2004 Structural Steel Welding—
Welding of Steel Structures

– AS1562.1: 2018 Design and installation of sheet 
roof and wall cladding Part 1: Metal

– AS/NZS 1664.1:1997 Aluminium structures— 
Limit state design

– AS 1684.2:2021 Residential Timber Framed 
Construction

– AS 3566.1:2002 Self Drilling Screws

– AS 3600:2018 Concrete Structures

– AS 4055:2021 Wind Loads for Housing

– AS 4100:2020 Steel Structures Code

– AS/NZS 4600:2018 Cold Formed Steel Structures

Referenced Standards

Summary of Contents for SIGNATURE ADGAZEBO33

Page 1: ...u www abscosheds com au 2 fall to rear o FRONT For construction in non cyclonic areas Wind rating N3 as per AS4055 2021 If you require a higher wind rating please contact us admin absco com au or 1800...

Page 2: ...n detail to gain a thorough understanding of assembly methods and associated details Unpack and carefully identify and check off all the parts against the parts described and illustrated on Components...

Page 3: ...K TR35 3020 mm 3115 mm Downpipe 80 mm RWG 21 1 QTY CHECK 2925 mm 2680 m m 3045 m m 3140 mm 3105 mm 1 QTY CHECK TU 8 QTY CHECK BK3 1 QTY CHECK 1 QTY CHECK 1 QTY CHECK 2 QTY CHECK 2 QTY CHECK 100 QTY CH...

Page 4: ...post 2 Fasten using four FAST100 tek screws and 5 16 nut setter Make sure screws are inset 20 mm from the edges of bracket for beam clearance To keep the parts aligned while fastening use a clamp or...

Page 5: ...nchors using the post baseplate as a template Use a hammer drill with a 12mm diameter masonry drill bit drill to a depth of 100mm Fasten to foundations with four concrete screws FAST103 per post using...

Page 6: ...K3 as shown 5 Make sure the ends of the beam are as far as they can go into the brackets there will be a small gap at the top for the front due to angle Fasten each end with four FAST100 tek screws as...

Page 7: ...nel 4 Safely position the first panel on top of the frame all the way to the left The steel top skin will sit over the rear flashing 5 Adjust so it s butted up against the rear trim and the side of th...

Page 8: ...skin male female features align TOP VIEW Fastening layout 7 Fasten roof panels to beams with a tek 14 x 125 mm FAST104 at the remaining positions NOTE pan fixed to centreline of beam unless noted othe...

Page 9: ...e side of roof panel Bent tab hard up against front Top face sits on two sheet ribs Bottom face covers the rear flashing 15 90 o SIDE FLASHING REAR DETAIL 0 TR36 flashing will overhang roof panel at t...

Page 10: ...DE VIEW 1 At the front take an outside measurement from the left to the right flashing Trim the front flashing TR37 to this length 2 Cover the front edge of the roof and flashings Carefully lift over...

Page 11: ...im away area shown in grey with tinsnips Repeat steps at the other end to make the other end stop 3 At the rear of the structure take an outside measurement from the left to the right flashing Trim th...

Page 12: ...mark onto the rear beam at the point shown 8 Take a string line and make a line from the high to low point this is for the two middle brackets 9 Align the bottom of the gutter bracket with the marks a...

Page 13: ...ten and damage Predrilling may be helpful 3 Cut the downpipe to length 4 Place the dropper RWG22 into the top of the downpipe and fasten and seal press into clips and slide up until it touches the und...

Page 14: ...art 0 General Principles AS NZS 1170 1 2002 Structural Design Actions Part 1 Permanent Imposed Other Actions AS NZS 1170 2 2021 Structural Design Actions Part 2 Wind Actions AS NZS 1170 3 2003 Design...

Reviews: