Absco Industries

Assembly Instruction Manual

ABSCO SIGNATURE PATIO

MODEL: ADPATIO6030

6.12m W x 3.11m D x  up to 3.18m H

Model: ADPATIO6030

21/09/23

1.0

3  

 

 

90 x 90 

Post

Post 

bracket

Beam End 

Cap

Gutter

Gutter 

Stop end

Dropper

80 to 

90 mm 

Adapter

Clip

Check off all components, parts shown are not to scale.

FASTENER PACKS

COMPONENT LIST

AD1 6

QTY CHECK

SB2 1

QTY CHECK

2

QTY CHECK

TR36

2

QTY CHECK

TR38

2

QTY CHECK

TR35

7

QTY CHECK

BK5

3020 mm

3105 mm

Downpipe

80 mm

RWG

21

1

QTY CHECK

2925 mm

5680 mm

3045 mm

3140 mm

3052 mm

1

QTY CHECK

TU

2

QTY CHECK

BK3

1

QTY CHECK

2

QTY CHECK

1

QTY CHECK

2

QTY CHECK

2

QTY CHECK

100

QTY

CHECK

FAST100

200

QTY

CHECK

FAST101

200

QTY

CHECK

FAST102

14

QTY

CHECK

14

QTY

CHECK

7

QTY

CHECK

10

QTY

CHECK

2

QTY

CHECK

FAST103

24

QTY

CHECK

FAST104

RWG

23

RWG

22

RWG

24

RWG

29

1

QTY CHECK

RWG

27

RWG

25

Gutter 

Bracket

7

QTY CHECK

RWG

26

2

QTY CHECK

3000 mm

PT5

Receiver 

Channel

Side 

Flashing

Touch-up 

Paint

Water proof 

Sealant

Insulated 

panel

Z Flashing

Rafter 

Bracket

2

QTY CHECK

BK4

Hex Bolts M10 x 25mm

Hex Bolts M10 x 75mm

14G 14 x 45 Tapcon

Type 17 12 x 50mm

FAST105

FAST108

FAST107

FAST106

Beam

Summary of Contents for ADPATIO6030

Page 1: ...If you are not capable it is recommended you hire a professional NOTE 2 The existing structure should be checked for its capacity to support and tie down this structure prior to construction by a suit...

Page 2: ...the structure must be left for a period of time uncompleted it must be made safe to prevent damage TOOLS REQUIRED Use as a guide other tools equipment may be suitable Safely work within your ability...

Page 3: ...WG 21 1 QTY CHECK 2925 mm 5680 m m 3045 m m 3140 mm 3052 mm 1 QTY CHECK TU 2 QTY CHECK BK3 1 QTY CHECK 2 QTY CHECK 1 QTY CHECK 2 QTY CHECK 2 QTY CHECK 100 QTY CHECK FAST100 200 QTY CHECK FAST101 200 Q...

Page 4: ...hannel is oriented with the longer side to the top A Brickwork Fix 14 x 45mm Tapcon screw every 450mm not suitable for structures with no eaves or two story with blueboard over brick Ensure a minimum...

Page 5: ...rst and it s straight 3 Mark out the anchoring position for the posts next 4 Place the two post bracket BK4 centred over these marks Drill the hole for the anchor using the post baseplate as a templat...

Page 6: ...imum height 3090 mm do not trim post Instead go to step 3 2 Take a post PT5 and mark all faces then safely cut post to length Consider sealing cut with supplied paint 3 Take a BK3 bracket and orientat...

Page 7: ...over the anchored post bracket Make sure the post is orientated so the top bracket is as shown 7 Use a spirit level check the post is vertical and fasten with four FAST100 tek screws and 5 16 nut sett...

Page 8: ...to the top 1 Remove the protective plastic coating from the outside of the beam 2 Safely lift and place a SB2 beam inside the post brackets BK3 as shown Overlap to top Overlap to bottom INTERIOR EXTER...

Page 9: ...he pans 15 degrees with a turn up down tool or equivalent as shown Familiarizeyourselfwiththeweightandorientation of the AD1 panel before lifting The bottom skin has a protective plastic coating this...

Page 10: ...om skin male and female features 6 Carefully push the panel up so it goes all the way into the receiver channel and is flush along the front beam Just like the 1st panel 7 As before fix the panel to t...

Page 11: ...movethetek14x125mmFAST104 from step 4 and insert the other Z flashing TR35 Trim to length so it finishes flush with the edge of the rightmost panel Refit screw through flashing and into original hole...

Page 12: ...kin end is against the top side of the flashing Then continue 30mm down the side 2 Mark off where the Z flashing is against the bottom side of the flashing Then continue 40mm up the side 3 On the side...

Page 13: ...sure the uphill gutter is notched and inside the other 2 Put silicone in the joint and then use two rivets FAST102 per side 3 Take a gutter end stop RWG25 and test fit it over an end of the gutter Ma...

Page 14: ...e rear beam at the point shown 10 Take a string line and make a line from the high to low point 11 Align the bottom of the gutter bracket with the marks and fasten to rear beam using rivets FAST102 Pl...

Page 15: ...tighten and damage Predrilling may be helpful 3 Cut the downpipe to length 4 Place the dropper RWG22 into the top of the downpipe and fasten and seal press into clips and slide up until it touches th...

Page 16: ...s Part 0 General Principles AS NZS 1170 1 2002 Structural Design Actions Part 1 Permanent Imposed Other Actions AS NZS 1170 2 2021 Structural Design Actions Part 2 Wind Actions AS NZS 1170 3 2003 Desi...

Reviews: