Absco Industries

Assembly Instruction Manual

ABSCO SIGNATURE PATIO

MODEL: ADPATIO6030

6.12m W x 3.11m D x  up to 3.18m H

Model: ADPATIO6030

21/09/23

1.0

16  

 

 

Information in this manual has been designed in 
accordance with the following Australian and New 
Zealand Standards.

– National Construction Code of Australia 2022

– Specification S4C2—Design of Building in 
Cyclonic Areas NCC2022 VOL 1

– Part H1D7 Sheet Roofing of NCC 2022 Vol 2

– AS 1163:1991 Structural Steel Hollow Sections

– AS/NZS 1170.0:2002 Structural Design Actions 
Part 0— General Principles

– AS/NZS 1170.1:2002 Structural Design Actions 
Part 1— Permanent, Imposed & Other Actions

– AS/NZS 1170.2:2021 Structural Design Actions 
Part 2— Wind Actions

– AS/NZS 1170.3:2003 Design Actions Part 3— 
Snow and Ice Actions

– AS/NZS 1554.1:2004 Structural Steel Welding—
Welding of Steel Structures

– AS1562.1: 2018 Design and installation of sheet 
roof and wall cladding Part 1: Metal

– AS/NZS 1664.1:1997 Aluminium structures— 
Limit state design

– AS 1684.2:2021 Residential Timber Framed 
Construction

– AS 3566.1:2002 Self Drilling Screws

– AS 3600:2018 Concrete Structures

– AS 4055:2021 Wind Loads for Housing

– AS 4100:2020 Steel Structures Code

– AS/NZS 4600:2018 Cold Formed Steel Structures

Referenced Standards

Summary of Contents for ADPATIO6030

Page 1: ...If you are not capable it is recommended you hire a professional NOTE 2 The existing structure should be checked for its capacity to support and tie down this structure prior to construction by a suit...

Page 2: ...the structure must be left for a period of time uncompleted it must be made safe to prevent damage TOOLS REQUIRED Use as a guide other tools equipment may be suitable Safely work within your ability...

Page 3: ...WG 21 1 QTY CHECK 2925 mm 5680 m m 3045 m m 3140 mm 3052 mm 1 QTY CHECK TU 2 QTY CHECK BK3 1 QTY CHECK 2 QTY CHECK 1 QTY CHECK 2 QTY CHECK 2 QTY CHECK 100 QTY CHECK FAST100 200 QTY CHECK FAST101 200 Q...

Page 4: ...hannel is oriented with the longer side to the top A Brickwork Fix 14 x 45mm Tapcon screw every 450mm not suitable for structures with no eaves or two story with blueboard over brick Ensure a minimum...

Page 5: ...rst and it s straight 3 Mark out the anchoring position for the posts next 4 Place the two post bracket BK4 centred over these marks Drill the hole for the anchor using the post baseplate as a templat...

Page 6: ...imum height 3090 mm do not trim post Instead go to step 3 2 Take a post PT5 and mark all faces then safely cut post to length Consider sealing cut with supplied paint 3 Take a BK3 bracket and orientat...

Page 7: ...over the anchored post bracket Make sure the post is orientated so the top bracket is as shown 7 Use a spirit level check the post is vertical and fasten with four FAST100 tek screws and 5 16 nut sett...

Page 8: ...to the top 1 Remove the protective plastic coating from the outside of the beam 2 Safely lift and place a SB2 beam inside the post brackets BK3 as shown Overlap to top Overlap to bottom INTERIOR EXTER...

Page 9: ...he pans 15 degrees with a turn up down tool or equivalent as shown Familiarizeyourselfwiththeweightandorientation of the AD1 panel before lifting The bottom skin has a protective plastic coating this...

Page 10: ...om skin male and female features 6 Carefully push the panel up so it goes all the way into the receiver channel and is flush along the front beam Just like the 1st panel 7 As before fix the panel to t...

Page 11: ...movethetek14x125mmFAST104 from step 4 and insert the other Z flashing TR35 Trim to length so it finishes flush with the edge of the rightmost panel Refit screw through flashing and into original hole...

Page 12: ...kin end is against the top side of the flashing Then continue 30mm down the side 2 Mark off where the Z flashing is against the bottom side of the flashing Then continue 40mm up the side 3 On the side...

Page 13: ...sure the uphill gutter is notched and inside the other 2 Put silicone in the joint and then use two rivets FAST102 per side 3 Take a gutter end stop RWG25 and test fit it over an end of the gutter Ma...

Page 14: ...e rear beam at the point shown 10 Take a string line and make a line from the high to low point 11 Align the bottom of the gutter bracket with the marks and fasten to rear beam using rivets FAST102 Pl...

Page 15: ...tighten and damage Predrilling may be helpful 3 Cut the downpipe to length 4 Place the dropper RWG22 into the top of the downpipe and fasten and seal press into clips and slide up until it touches th...

Page 16: ...s Part 0 General Principles AS NZS 1170 1 2002 Structural Design Actions Part 1 Permanent Imposed Other Actions AS NZS 1170 2 2021 Structural Design Actions Part 2 Wind Actions AS NZS 1170 3 2003 Desi...

Reviews: