background image

www.abl.de

4

English

1. Safety information

Read this installation manual carefully before installing

 

SBC 

home. 

SBC 

home shall only be 

installed by a licensed electrician. This installation manual describes the necessary steps 
to install 

SBC 

home. For other products, like the charging station, see the separate 

installation manuals that come with each product. 

SBC 

home

 

and other components must 

be installed in accordance with national and local regulations. Good installation practice 

must be followed. 

A warning symbol means that extra care must be taken; otherwise damage or 
injury could occur.

SBC 

home is to be used exclusively for its intended purpose. Use for any other purpose, 

or in any other manner, will be deemed to be "not in accordance with the intended 
purpose". 

ABL 

is not liable for any damage or inadequate/incorrect outcomes resulting 

from improper configuration or use. 

2. Terms

1. Charging station

3. Charging pole

5. Charge controller (EVCC)

2. Wallbox

4. Charge point

1

1

1

2

2

4

4

4

4

5

5

2

5

1

3

4

5

4

Summary of Contents for SBC Home

Page 1: ...SBCHome Installation manual B S ABL...

Page 2: ...www abl de 2 English 20 pages...

Page 3: ...stalling the wallbox 9 IT network with local TN network 10 Configuring the wallbox for SBChome 11 Installing SBChome 12 Charge controller address vs current sensor input 13 Installation examples TN ne...

Page 4: ...in accordance with national and local regulations Good installation practice must be followed A warning symbol means that extra care must be taken otherwise damage or injury could occur SBC home is t...

Page 5: ...e will share the available power When a vehicle is fully charged or is disconnected from a charge point the available power will be distributed evenly among other charge points which are still chargin...

Page 6: ...in total is 10 Maximum 6 charge points for three phase charging Maximum 2 charge points for single phase charging Maximum 5 charge points for three phase charging for IT network with local TN network...

Page 7: ...l input 1 LED power indicator Input AC current sensor 1 Communication port LED status indicator Control input ground 12V DC power 12V DC power Input AC current sensor 2 Input AC current sensor 3 Contr...

Page 8: ...tion pattern Find corresponding phase s between the inlet fuse and the charge point s The charge points need unique addresses NB The system will not work as intended if the phases do not correspond Ma...

Page 9: ...L3 N L2 L3 L1 N L3 L1 L2 N L3 L1 L2 N L2 L3 L1 N L1 L2 L3 N Phase rotation single phase charging TN network Phase rotation single phase charging IT network Phase rotation three phase charging TN netwo...

Page 10: ...otherwise the communication may be lost or SBChome may be damaged Connect a communication cable between SBC home and the wallbox Use RJ12 connectors included in the SBC home kit Use a communication ca...

Page 11: ...the kit as shown Apply mains power to the wallbox es after thorough inspection of the installation 9 IT network with local TN network Some electric vehicles have an onboard charging system that requi...

Page 12: ...he following charge controllers to the same phase Address 1 and 4 Address 2 and 5 Address 3 and 6 This connection and address pattern must be followed even when fewer than six wallboxes are used See t...

Page 13: ...ent sensor s can be mounted before the main fuse Take extra care during installation on the input side Clip on insulated wires only The AC current sensor is not suitable for uninsulated bus bars that...

Page 14: ...V DC cable between the power supply and SBC home Route the communication cables away from line voltage elements Do not route the SBC home cables in parallel with the supply lines Secure the cables wit...

Page 15: ...ging 1 S1 2 S1 Three phase TN network single phase charging 1 S1 2 S2 3 S3 4 S1 5 S2 6 S3 Three phase TN network three phase charging 1 S1 S2 S3 2 S1 S2 S3 3 S1 S2 S3 4 S1 S2 S3 5 S1 S2 S3 6 S1 S2 S3...

Page 16: ...ee TN Three 6 14 Installation examples IT network Power line in Transformer Power line out Charging network Max charge points Network type Phases Network type Phases IT Single IT Single 2 See SBC home...

Page 17: ...vice to the SBC home s communication port Use the USB RS485 interface from ABL to connect a PC Use an additional USB adapter cable to connect to an Android device Configure SBC home according to your...

Page 18: ...charging by itself within 1 5 minutes depending on the configuration of the charge point SBC home recalculates the available current to the other charge points in use 18 Limited operation mode In lim...

Page 19: ...trol input 1 and 2 and it can be configured up to 63A Control input 1 has priority over control input 2 if both are activated 21 Relay output To prioritize charging the relay output of homeCLU can be...

Page 20: ...oltage short term survival non operational 24 to 24V DC Power consumption 3W IP rating 20 Maximum relay output 250V AC 5A Dimensions homeCLU W x H x D 54 x 91 x 58mm DIN rail modules homeCLU 3 modules...

Reviews: