| Installation –
Positioning the EMH9999 foundation and installing the POLEMHx
16
2
Apply a first layer of concrete screed with a height
of approx. 10 cm at the positioning location of the
foundation.
120
75
10
3
Place the foundation centrally on the concrete
screed. Make sure the supply cable can be insert-
ed into the pipe opening on the foundation in this
position.
y
This step must be performed by two people.
NOTE
Marking for installation
The EMH9999 foundation features markings to prevent errors when setting up: The top side with the ground
anchors is marked
TOP
, while the adjacent
arrow
marks the front side of the mounting pole for installing the
wallbox.
NOTE
Laying data lines
If you wish to operate the wallbox in a group installation or control it in another way, you will also need to lay
the appropriate data cables at the installation site.
4
Level the foundation on the concrete screed on all
planes. Form a circumferential support structure
around the foundation with concrete screed (45°
smooth line to approximately the lower edge of the
pipe opening for the supply cables).
Glättkelle
1,5 m
5
Allow the concrete to set completely over a reason-
able period of time so that the foundation is pro-
tected from slipping when the ditch is eventually
filled and compacted with compactable soil.
6
Run the supply cable (and data cables) with suffi-
cient length (approx. 1.5 m) through the pipe open-
ing(s) in the foundation for the subsequent installa-
tion of the wallbox on the mounting pole.