BAL.0212.0 • 2018-07-16
EN - 9
PP
4 Putting into operation
4.2.2 Liner (plastic)
For use with aluminium, copper, nickel and stainless steels
1
Lay down the cable assembly straight and unscrew nut from central connector
.
2
Sharpen the beginning of the PA liner
to approx. 40° using the
ABICOR BINZEL
sharpener
3
Slide PA liner
through the wire conduit
until a noticeable
resistance is felt.
4
Slide clamp nipple
, O-ring
on the PA liner
under tension.
5
that is too long in front of the wire feed rolls
(wire feeder).
6
Cut the PA liner
at the mark directly in front of the wire feed rolls using the
ABICOR BINZEL
cutter
.
7
Sharpen the cutting point.
4.3 Connecting the cable assembly
1
Join central connector and central socket at the wire feed unit and secure them with the
connection nut.
2
Properly mount the connections for coolant supply/return, shielding gas and control lead
plug.
1
Wire conduit
2
Central connector
3
Nut
4
Wire feed rolls
5
ABICOR BINZEL
Cutter
6
O-ring
7
Clamp nipple
8
Liner (plastic)
9
ABICOR BINZEL
Sharpener
10
Inlet nipple
Fig. 3
Shortening the PA liner
1
2
4
3
5
6
7
8
9
10
40°
WARNING
Risk of burns
The welding torches will become overheated if the coolant level is too low.
• Wear protective gloves.
• Check the coolant level at regular intervals.