![Abbott 3599 Clinician Manual Download Page 18](http://html2.mh-extra.com/html/abbott/3599/3599_clinician-manual_5034347018.webp)
Overview of the EPG Procedure
The following steps provide a general overview of the EPG procedure. Refer to the following sections for
more information about each of these steps.
1. Replace the EPG batteries.
1.
2. Set up communication between the EPG and the clinician programmer and patient controller.
2.
3. Implant the leads or extensions.
3.
4. Connect the leads or extensions to the multilead trial cable.
4.
5. Connect the multilead trial cable to the EPG.
5.
6. Test the system.
6.
7. Disconnect the multilead trial cable from the EPG.
7.
8. Disconnect the multilead trial cable from the leads or extensions.
8.
9. Secure the leads or extensions and bandage the lead entry site.
9.
10. Connect the EPG header to the EPG.
10.
11. Insert the leads or extensions into the EPG header.
11.
12. Place the EPG into the pouch and secure to the patient.
12.
13. Program the system.
13.
12