INTERLOCKS BETWEEN PANELS
APPAR ATUS CO NTRO L TESTING
62
1VLG5000 17 C
Step 8/11
Repeat step 5 for other stages of Arc protection (represent other compartments of switch-
gear)
On the protection relay LHMI go to->
Main Menu/Test/Function tests/Other protection
–
ARCSARC2 = Activate OPERATE
–
ARCSARC2 = Deactivate OPERATE
–
ARCSARC3 = Activate OPERATE
–
ARCSARC3 = Deactivate OPERATE
Step 9/11
On the protection relay LHMI (tested feeder) go to ->
Main Menu/Test/IED test
–
Test mode = Normal mode
Ready LED is steady ON.
Figure 96: Entering test mode
Step 10/11
Repeat steps 4-8 for all feeders.
Step 11/11
On the protection relay LHMI (upstream circuit breaker) go to ->
Main Menu/Test/IED test
–
Test mode = Norma mode
Summary of Contents for UniGear Digital
Page 1: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Page 2: ......
Page 3: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Page 6: ......
Page 10: ......
Page 12: ......
Page 96: ......
Page 98: ...Visit us www abb com mediumvoltage Document Number 1VLG500017 Rev C...