Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
Maintenance
5
Cleaning the compressor during
operation
5.3
Page 58
Sept
em
be
r 2
014
H
ZT
L24
98_
EN
R
ev
is
ion A
After cleaning, wait at least 5 minutes to allow the turbocharger to dry.
NOTICE
If the cleaning operation is not satisfactory, it may be repeated up to
two times.
If the cleaning results are still not satisfactory after three attempts and
the engine values are also unsatisfactory, we recommend that you have
the turbocharger inspected and cleaned by an official ABB
Turbocharging Service Station.
Cleaning parameters per turbocharger compressor
Product
Engine load
Contents of water vessel
[dm
3
]
TPL65-A32/33/36
50 … 85%
0.4
TPL69-A32/33
0.4 or 1.0
© Copyright 2014 ABB. All rights reserved.