6.
Import the Exported project by browsing to your project and click open
8.1.2
IED configuration migration (ICM)
GUID-8925C7B0-F6F9-44C3-BD22-8F15C3E83F51 v1
1.
Select the IED to migrate and right click migrate configuration
2.
Select the version to migrate to (e.g. 1.2.0) in the Dialog and press continue.
Section 8
1MRK 511 433-UEN B
IED configuration migration tool
50
SAM600 Process Bus I/O System
Engineering manual
© Copyright 2017 ABB. All rights reserved