Verify operating levels (trip) and timers.
•
Verify alarm and blocking signals.
•
Use the disturbance handling tool in PCM600 to evaluate that the protection function
has received the correct data and responded correctly (signaling and timing).
•
Use the event viewer tool in PCM600 to check that only expected events have
occurred.
10.8
Forcing of binary I/O signals for testing
10.8.1
Forcing concept
Forcing of binary inputs and outputs is a convenient way to test wiring in substations as
well as testing configuration logic in the IEDs. Basically it means that all binary inputs and
outputs on the IED I/O modules (BOM, BIM, IOM & SOM) can be set to a value (i.e active
or not-active), selected by the user, while the IED is in test mode. For inputs, this is true
regardless of the actual signal voltage present on the input. For outputs, any output relay
can be forced to be active or not, regardless of the current requested state of the output in
the IED logic configuration.
Be observant that forcing of binary inputs and outputs on an IED, with
inappropriate setup, can result in potential danger.
10.8.2
How to enable forcing
To enable forcing, the IED must first be put into IED test mode. While the IED is not in
test mode, the LHMI/PCM600 menus that relate to forcing will not have any effect on the
input/output status due to safety reasons.
10.8.2.1
Enable forcing by using LHMI
1.
Enable IED Testmode by setting
IEDTestMode
to
On
under
Main menu/Test/IED
test mode TESTMODE:1
.
1MRK 511 366-UUS -
Section 10
Testing IED operation
89
Commissioning manual
Summary of Contents for RES670 2.1
Page 1: ...Relion 670 series Phasor measurement unit RES670 2 1 ANSI Commissioning manual ...
Page 2: ......
Page 14: ...8 ...
Page 56: ...50 ...
Page 60: ...54 ...
Page 68: ...62 ...
Page 86: ...80 ...
Page 102: ...96 ...
Page 178: ...172 ...
Page 200: ...194 ...
Page 201: ...195 ...