Test the correct functionality by simulating different kind of faults. Also check that sent
and received data is correctly transmitted and read.
A test connection is shown in figure
. A binary input signal (BI) at End1 is configured
to be transferred through the communication link to End2. At End2 the received signal is
configured to control a binary output (BO). Check at End2 that the BI signal is received
and the BO operates.
Repeat the test for all the signals configured to be transmitted over the communication
link.
ANSI07000188 V1 EN
Figure 31:
Test of RTC with I/O
11.15
Basic IED functions
11.15.1
Parameter setting group handling SETGRPS
Prepare the IED for verification of settings as outlined in section
in this chapter.
1MRK 511 366-UUS -
Section 11
Testing functionality by secondary injection
165
Commissioning manual
Summary of Contents for RES670 2.1
Page 1: ...Relion 670 series Phasor measurement unit RES670 2 1 ANSI Commissioning manual ...
Page 2: ......
Page 14: ...8 ...
Page 56: ...50 ...
Page 60: ...54 ...
Page 68: ...62 ...
Page 86: ...80 ...
Page 102: ...96 ...
Page 178: ...172 ...
Page 200: ...194 ...
Page 201: ...195 ...