1.
Simulate normal operating conditions with the three-phase currents in phase with
their corresponding phase voltages and with all of them equal to their rated values.
2.
Change the voltages and currents in all three phases simultaneously.
The voltage change must be higher than the set value
DVPU
and the current change
must be lower than the set value
DIPU
.
•
The BLKV and BLKZ signals appear without any time delay. The BLKZ
signal will be activated only if the internal deadline detection is not activated
at the same time.
•
3PH should appear after 5 seconds, if the remaining voltage levels are lower
than the set
VDLDPU
of the dead line detection function.
3.
Apply normal conditions as in step
.
The BLKV, BLKZ and 3PH signals should reset, if activated, see step
4.
Change the voltages and currents in all three phases simultaneously.
The voltage change must be higher than the set value
DVPU
and the current change
must be higher than the set value
DIPU
.
The BLKV, BLKZ and 3PH signals should not appear.
5.
.
6.
Connect the nominal voltages in all three phases and feed a current below the trip
level in all three phases.
7.
Keep the current constant. Disconnect the voltage in all three phases simultaneously.
The BLKV, BLKZ and 3PH signals should not appear.
8.
Change the magnitude of the voltage and current for phase 1 to a value higher than
the set value
DVPU
and
DIPU
.
9.
Check that the pickup output signals PU_DV_A and PU_DI_A and the general
pickup signals PU_DV or PU_DI are activated.
10. Check that the pickup output signals for the current and voltage phases 2 and 3 are
activated by changing the magnitude of the voltage and current for phases 2 and 3.
11.8.2.6
Completing the test
Continue to test another function or end the test by changing the
TestMode
setting to
Disabled
. Restore connections and settings to their original values, if they were changed
for testing purposes.
11.9
Control
11.9.1
Single command, 16 signals SINGLECMD
For the single command function block, it is necessary to configure the output signal to
corresponding binary output of the IED. The operation of the single command function
(SINGLECMD) is then checked from the local HMI by applying the commands with
1MRK 511 366-UUS -
Section 11
Testing functionality by secondary injection
153
Commissioning manual
Summary of Contents for RES670 2.1
Page 1: ...Relion 670 series Phasor measurement unit RES670 2 1 ANSI Commissioning manual ...
Page 2: ......
Page 14: ...8 ...
Page 56: ...50 ...
Page 60: ...54 ...
Page 68: ...62 ...
Page 86: ...80 ...
Page 102: ...96 ...
Page 178: ...172 ...
Page 200: ...194 ...
Page 201: ...195 ...