4.
Overall check in principal as above (non-directional overcurrent feature)
5.
Reverse the direction of the injection current and check that the protection does
not operate.
6.
Check with low polarization voltage that the feature becomes non-directional,
blocked or with memory according to the setting.
10.8.1.5
Over/Undervoltage feature
Procedure
1.
Connect the test set for injection three-phase voltages to the appropriate voltage
terminals of the IED.
2.
Inject voltage(s) in a way that relevant measured (according to setting parameter
VoltageInput
) voltages are created from the test set.
3.
Overall check in principal as above (non-directional overcurrent feature) and
correspondingly for the undervoltage feature.
10.8.1.6
Completing the test
Continue to test another function or end the test by changing the
TestMode
setting to
Off
. Restore connections and settings to their original values, if they were changed for
testing purposes.
10.9
Secondary system supervision
10.9.1
Current circuit supervision CCSSPVC
Prepare the IED for verification of settings outlined in section
The Current circuit supervision function CCSSPVC is conveniently tested with the
same three-phase test set as used when testing the measuring functions in the IED.
The condition for this procedure is that the setting of
IMinOp
is lower than the setting
of
Ip>Block
.
10.9.1.1
Verifying the settings
Section 10
1MRK 506 355-UEN A
Testing functionality by secondary injection
188
Line distance protection REL670 2.1 IEC
Commissioning manual
Summary of Contents for Relion 670 Series REL670
Page 1: ...Relion 670 series Line distance protection REL670 2 1 IEC Commissioning manual ...
Page 2: ......
Page 30: ...24 ...
Page 34: ...28 ...
Page 64: ...58 ...
Page 68: ...62 ...
Page 90: ...84 ...
Page 254: ...248 ...
Page 260: ...254 ...
Page 269: ...263 ...