![ABB ProKiln GAC400 Operating Instruction Download Page 81](http://html1.mh-extra.com/html/abb/prokiln-gac400/prokiln-gac400_operating-instruction_4693066081.webp)
ProKiln GAC400
PROBE GAS SAMPLING SYSTEM | OI/GAC400-EN REV. A
81
Maintenance schedule
The following tables show the maintenance intervals within which to perform maintenance work, with a link to the relevant
instructions:
General tasks
Maintenance task
See...
Inspection / Maintenance intervals
As
re
qu
ire
d
D
ail
y
W
eek
ly
Twi
ce
yea
rl
y
Y
ear
ly
Ever
y t
w
o yea
rs
Check the system and clean if necessary
Checking the condition of the system, cleaning
the system
on page 102
X
Display and evaluate trend display
Evaluating trend displays
on page 104
X
Functional test of residual current circuit breaker
Checking the residual current circuit breaker
on
page 105
X
Functional tests of:
• EMERGENCY STOP switch
• Warning lamps
• Warning buzzer
Checking protective installations
on page 106
X
Probe
Maintenance task
See...
Inspection / Maintenance intervals
As
re
qu
ire
d
D
ail
y
W
eek
ly
Tw
ic
e yea
rl
y
Y
ear
ly
Ever
y t
w
o yea
rs
Mechanical cleaning of probe tube and tip
Probe: Removing incrustations
on page 112
X
X
Replace intake filter
Probe: Replacing the intake filter
on page 115
X
X