Cooling water circuit regulation
The open cooling-water circuit must be connected to a potable
water outlet (requirements: see
Installing the water system and
cooling panel
on page 48). The circulation pump transports at
least 6 m³/h (1585 gal US/h) through the probe cooling jacket.
The resistance thermometer is installed in the cooling water
tank and signals to the water temperature controller.
The water flows through the heat exchanger where a fan is
operated to control the required cooling of the water based on
the water tank temperature. The flow rate is monitored as the
water returns from the probe in order to validate the actual flow
which has been cooling the probe. Monitoring is performed on
the HMI on the control cabinet.
Requirements for the water supply
The water supply must meet the following minimum
requirements:
Category
Requirement
Consumption
0 to 2 m³/year (0 to 528.35 gal US/year)
Quality
Potable water (do not use anti-corrosive), do not use
demineralized water
Ambient temp.
below 0 °C (32 °F)
• Glycol as anti-freeze. Anti-freeze with anti-corrosive
additive is not permitted.
• Option for water tank heater
Water panel cabinet
The figure below shows the water panel cabinet:
Figure 9: Water panel cabinet
Pos. Component
Function
1
Probe cooling On/Off
Disconnects the power supply to the
water and cooling system
2
Breaker for water pump
Turns off water pump
3
Breaker for Cooling fan 1
Turns off fan 1
4
Breaker for Cooling fan 2
Turns off fan 2
5
Breaker for Tank Heater
Turns of Tank Heater (optional but
electrically prepared)