![ABB ProKiln GAC400 Operating Instruction Download Page 48](http://html1.mh-extra.com/html/abb/prokiln-gac400/prokiln-gac400_operating-instruction_4693066048.webp)
48
ProKiln GAC400
PROBE GAS SAMPLING SYSTEM | OI/GAC400-EN REV. A
… 6 Installation
Installing the compressed-air supply
Requirements
• A minimum 270 litres air tank must be connected to the
probe gas sampling system. The air tank is an optional part
of the standard supply.
• The following conditions must be met:
– Only an air tank and connection piping complying with
local standards and regulations for compressed-air
installations must be used.
– Compressed-air conforms to the required quality of
compressed-air, see
Air supply
on page 58.
Instructions
Take the following steps to install the compressed-air supply:
1. Fasten compressed-air tank in suitable position as close to
the retractor unit as possible. The air tank must be protected
against heat radiation or any area of elevated temperature.
2. Pneumatically connect compressed-air tank directly to the
probe gas sampling system via minimum 1
″
piping.
Installing the control cabinet
Required for mounting of control cabinet
See the as build EL-DOCUMENTATION FOR PROBE SYSTEM
enclosed inside the control cabinet when supplied.
Screws required for assembly
4 galvanized steel screws (or stainless material) M10 or bolts
M10
Instructions
How to install the control cabinet:
Fasten control cabinet in suitable position (see Choosing the
place of installation of the control cabinet) with 4 assembly
screws or bolts.
Installing the water system and cooling
panel
Screws required for assembly
4 + 4 galvanized steel screws (or stainless material) M16 or bolts
M16
Requirements
The following requirements must be met in order to install the
cooling module:
• The site conforms to the designated site conditions (criteria
see Choosing the place of installation of the peripheral
modules)
• The water and cooling system should preferably be installed
at the same height level as the probe. Maximum height level
from water and cooler unit to retractor is 10m. Maximum
horizontal distance is 20m.
• Fastening points are present to affix the cooling module.
• The cooling module is unpacked.
Position of the connections
The location of the connections tags on the various modules can
be found in the pneumatic/hydraulic interface plan in the
appendix.
Instructions
How to install the cooling system:
1. Fasten water and cooling module in suitable position,
preferably next to each other (see Choosing the place of
installation of the cooling module), with screws or bolts on
the ground.
2. If placed next to each other (within 1m) use the hose supplied
to connect between water unit and cooling unit. If longer
distance is required, use minimum 1” piping.
3. Attach suitable drain tubes
4. After assembling the probe retractor and cooling module,
determine the length of the cooling-water hoses.
5. Lay and fasten cooling-water hoses along designated path.
6. Use minimum 1” piping to connect water system forward-
and return-hoses to the retractor connection points.