Page 40
© Copyright 2021 ABB. All rights reserved.
Install the CPS6000 Shelf
Important Note
The following procedures are in order for a typical application. If the left side of the shelf will be
blocked after the shelf is installed in the framework, the following procedures should be done before
installing the shelf:
•
Inter
-
Shelf Connections (multi
-
shelf installations only)
•
AC Connections
•
Office Alarm Cable
•
Thermal Probe Connection
Leave a sufficient service loop on these cables.
Install the CPS6000 Shelf
Follow the steps in the table below to mount the CPS6000 shelf into a 19
-
inch or 23
-
inch frame.
Step
Action
1.
Locate the 2 mounting brackets, one on each side of the CPS shelf; align the holes in the shelf
-
mounting
bracket with the holes in the mounting frame. See Figure 5
-
4.
2.
Attach the CPS shelf to the frame using a minimum of four (two on each side) of the 12
-
24 screws
included in the supplied parts bag. Refer to the table below for Torque Specifications.
Hardware
Torque
Nm
In
-
lbs.
Metric M5
4
35
12
-
24
4
35
Metric M6
7.3
65
Figure 5
-
4: CPS6000 Frame Mounting
Summary of Contents for CPS6000
Page 6: ...Page 6 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 36: ...Page 36 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 82: ...Page 82 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 98: ...Page 98 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 124: ...Page 124 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 146: ...Page 146 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 152: ...Page 152 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 174: ...Page 174 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 188: ...Page 188 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 192: ...Page 192 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 196: ...Page 196 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 198: ...Page 198 Copyright 2021 ABB All rights reserved This page intentionally left blank ...