INSTALLATION
MOUNTING THE G ATEWAY
4JNO0 0030 8 A
25
5
Installation
Installation, operation, and maintenance may only be carried out by qualified electricians.
Follow the installation instructions described. When installing and operating the device, the
applicable regulations and safety directives (including national safety directives), as well as
general technical regulations, must be observed. Observe the technical data in this user man-
ual and subsequent documentation (
–
In order to protect the modules against electrostatic discharge when working on control
cabinets (or junction boxes), the operating personnel must remove electrostatic dis-
charge before opening junction boxes or control cabinets and before touching the gate-
way.
–
The AWIN GW120 is snapped onto a standard rail within a control cabinet or switch box.
Power is supplied via power plug. The control cabinet or switch box must comply with the
specifications of EN 60950-1:2001 with respect to fire enclosure. For power supply re-
quirements refer to document
3BNP103003D3 Specific Conditions Of Use
.
–
The device must not be opened or modified. Do not repair the device yourself; replace it
with an equivalent device. Repairs may only be carried out by ABB. The manufacturer is
not liable for damage resulting from violation.
–
The IP20 degree of protection (EN 60529) of the device is intended for a clean and dry en-
vironment. Do not subject the device to any load that exceeds the prescribed limits.
The device is designed for installation in zone 2, potentially explosive areas.
Correct usage in potentially explosive areas.
–
Do not use the device in atmospheres with a danger of dust explosions.
–
Observe the specific conditions of use (3BNP103003D3) in potentially explosive
areas.
–
The equipment shall be installed inside of a suitably certified tool-secured enclo-
sure that provides a minimum ingress protection of IP54 in accordance with EN
IEC 60079-0.
–
Only passive antennas may be operated with the gateway.
The device must be stopped and immediately removed from the Ex area if it
–
is damaged.
–
was subject to an impermissible load.
–
was stored incorrectly.
–
malfunctions.
5.1
Mounting the Gateway
5.1.1
Mounting the AWIN GW120
shows a typical AWIN GW120 installation with end clamps and a DIN rail grounding
block.
Summary of Contents for AWIN GW120
Page 1: ... ENERGY INDUSTRIES ABB Wireless Industrial Network AWIN GW120 User Manual ...
Page 2: ......
Page 3: ... ENERGY INDUSTRIES ABB Wireless Industrial Network AWIN GW120 User Manual ...
Page 8: ......
Page 10: ......
Page 12: ......
Page 74: ......
Page 75: ......
Page 76: ... Visit us abb com awin Document Number 4JNO000308 Rev A ...