36 Operation principle and hardware description
Filters
E205
du/dt filter (page
Line options
F250
Line contactor
Heaters and auxiliary control voltage
G300
Cabinet heater (external supply). See page
.
Lights
G327
Ready pilot light, white
G328
Run pilot light, green
G329
Fault pilot light, red
Cabling
H351
Top entry of cables
H353
Top exit of cables
H358
Cable conduit entry. See page
.
Control panel
J429
ACS-AP-W Assistant control panel with Bluetooth interface
Fieldbus adapters
K451
FDNA-01 DeviceNet™ adapter module
K454
FPBA-01 PROFIBUS DP adapter module
K457
FCAN-01 CANopen adapter module
K458
FSCA-01 RS-485 adapter module
K462
FCNA-01 ControlNet™ adapter module
K469
FECA EtherCat adapter module
K470
FEPL EtherPOWERLINK adapter module
K473
FENA-11 Ethernet adapter module for EtherNet/IP™, Modbus TCP and PROFINET IO protocols
K475
FENA-21 Ethernet adapter module for EtherNet/IP™, Modbus TCP and PROFINET IO protocols,
2-port
I/O extensions and feedback interfaces
L501
CMOD-01 external 24 V DC/AC and digital I/O extension module (two relay outputs and one
digital output)
L504
Additional I/O terminal block
L512
CHDI-01 115/230 V digital input extension module (six digital inputs and two relay outputs)
L523
CMOD-02 external 24 V and isolated PTC interface
L537
CPTC-02 ATEX-certified thermistor protection module
Specialties
P904
Extended warranty
P912
Seaworthy packing
P929
Container packing
Safety functions
Q951
Emergency stop of Category 0 with opening the main contactor or breaker
Q971
ATEX-certified Safe disconnection function, EX II (2) GD. ReL537.
Printed documentation (manuals, dimensional drawings, circuit diagrams and manual language).
Note:
The delivered manual set may include manuals in English if the translation is not available.
R700
English
R701
German
R702
Italian
Code
Description
Summary of Contents for ACS580-07-0495A-4
Page 1: ...ABB general purpose drives Hardware manual ACS580 07 drives 250 to 500 kW ...
Page 4: ......
Page 8: ...4 Update notice ...
Page 16: ...12 ...
Page 24: ...20 Safety instructions ...
Page 42: ...38 Operation principle and hardware description ...
Page 74: ...70 Electrical installation PE PE 8 PE 13 11 7 8 12 13 ...
Page 82: ...78 Electrical installation ...
Page 102: ...98 Fault tracing ...
Page 114: ...110 Maintenance R10 and R11 4 5 2 7 6 3 8 ...
Page 115: ...Maintenance 111 R10 and R11 9 10 ...
Page 116: ...112 Maintenance R10 and R11 11 ...
Page 117: ...Maintenance 113 R10 and R11 12b 12a ...
Page 118: ...114 Maintenance R10 and R11 R10 and R11 17 14 13 R11 15 16 ...
Page 134: ...130 Technical data ...
Page 137: ...Dimension drawings 133 13 Dimension drawings Example dimension drawings are shown below ...
Page 138: ...134 Dimension drawings Frames R10 and R11 IP42 ...
Page 139: ...Dimension drawings 135 Frames R10 and R11 IP54 option B055 ...
Page 140: ...136 Dimension drawings ...
Page 152: ...148 Safe torque off function ...
Page 174: ...Contact us www abb com drives www abb com drivespartners 3AXD50000032622 Rev A EN 2016 03 16 ...