Lift the bushing to a position above the floor and
turn the bushing to a horizontal position.
1.
Install the lifting tool (88) to the flange.
2.
Install soft lifting slings from the lifting tool
(88) to a second crane.
3.
Lower the upper part of the bushing. Stop
when the bushing is in a horizontal position.
CAUTION!
Do not let the bushing come in contact
with the floor while lowering the
bushing to a horizontal position.
Contact with the floor can cause
damage to the bushing.
G007209
6.
Lower the bushing to the floor.
CAUTION!
Make sure that there are support blocks on the floor.
7.
Remove the lifting tool, refer to
Installation of lifting tools,
page
8.
Install the transport cover (13) on the transformer
turret (11).
G004927
End of instruction
Summary of Contents for 1ZSC902110-AAA
Page 12: ...12 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 18: ...18 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 78: ...78 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 82: ...82 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...