6
Options
Warning!
The installation and cabling of the options must be performed by an ABB Service Technician only.
Make sure that the UPS installation is completely powered down.
Refer to the “Safety prescriptions - Installation” described on Chapter 1.
6.1
Top Cable Entry/Exit Sidecar (TCE) and Top Hat Fascia (THF)
Fig. 6.1-1 UPS with “TCE & THF
“Top Cable Entry/Exit Sidecar” (TCE) and “Top Hat Fascia” (THF)
Allows the connection of input and output cables from the top of the UPS.
The “Top Cable Entry/Exit Sidecar“ can be located on either side of the UPS
cabinet.
The “Top Cable Entry/Exit Sidecar“ is accessibly from lateral panel (see panel “G”
in the Fig. 6.1-3).
Dimensions (W x D x H)
TCE:
3.94”x34.06”x75.00” /100x865x1905mm
THF:
23.62”x34.06”x10.83” /600x865x1237mm
Weight
TCE:
88lbs / 40kg
THF:
22lbs / 10kg
Screw torque specifications
Tensilock / Torx M5x12:
26Lb-in / 3Nm
Fig. 6.1-2 Top Hat Fascia (THF) assembling
“Top Hat Fascia” (THF) assembling
-
Place the structure “Top Hat Fascia - B” over the roof “A” of the UPS
cabinet.
-
Fix the structure “Top Hat Fascia - B” with the appropriate screws.
TLES_
UL_04
0-150_
S1_UP
S+TC
E+TH
F_ABB
_01
TLE
S_U
L_0
40-
150
_S1
_UP
S+TH
F_A
sse
mb
ling
_AB
B_0
1
Top
Hat Fascia
Tensilock
M5x12
A
B