21
Installation Steps
1. Unpack the Industrial switch
2. To hang the Industrial switch on the wall, please refer to the
Wall Mounting
section.
3. Use an M8 wrench to hold the grounding contact and remove the fixing screw above
the contact.
4. Align the grounding lug with the contact; and still use the M8 wrench to hold the
contact from rotating while you are tightening the fixing screw.
5. To power on the Industrial switch, please refer to the
Wiring the Power Inputs
section for further information on how to wire the power. And then the power LED on
the Industrial switch will light up. Please refer to the
LED Indicators
section for
indication of LED lights.
6. Prepare the M12 D-Code Fast Ethernet Port mating cable for Ethernet connection.
7. The Fast Ethernet port LED on the Industrial switch will light up when the cable is
connected with the network device. Please refer to the
LED Indicators
section for
LED light indication.
8. When all connections are set and LED lights all show in normal, the installation is
complete.
Note
This equipment is intended for use in a Pollution Degree 2
industrial environment.
Summary of Contents for LNX-1002NM-67-T
Page 1: ...8 port 10 100TX 2 port 100FX IP 67 Managed Industrial Ethernet Switch User Manual ...
Page 50: ...45 Syslog Configuration interface ...
Page 52: ...47 SMTP Configuration interface ...
Page 59: ...54 SNTP Configuration interface ...
Page 61: ...56 IP Security interface ...
Page 65: ...60 Port Statistics interface ...
Page 67: ...62 Port Control interface ...
Page 90: ...85 RSTP Port Configuration interface ...
Page 92: ...87 SNMP System Configuration interface ...
Page 105: ...100 802 1x System Configuration interface ...